Single-family, 2–4 units, infill, multi-lot takedowns, spec and custom. From the land through the final line item, with draws funded in 48 hours.
Construction financing built around the budget, the GC and the supported as-complete value. Maximum leverage depends on the file; the term sheet sets the project’s terms.
Building on several lots? Bring the takedown plan and a budget that separates the work on each lot.

High-end custom and spec homes are part of this residential program. Larger budgets are reviewed against the plans, specifications and as-complete value — not a separate luxury leverage promise.
Renovating an existing property instead? See fix & flip financing.
Loan-to-cost measures the loan against the project cost; loan-to-value measures it against the appraised value. Cost basis sizes the loan and as-complete value caps it. The program terms are up to 90% LTC and 70% ARV; the final term sheet reflects the project and the supported valuation.
Submit photos and invoices from the site through the app. Standard line items are reviewed remotely; inspection evidence must support the completed work against the approved budget. Draws are funded in 48 hours and the schedule advances to the next milestone.
Bring the land acquisition cost, ownership or contract documents and any existing debt. The desk reviews the documented land basis and supported value when sizing your contribution; land equity is assessed on the file, not assumed from an asking price.
Yes. Single-family and 2–4 unit residential projects include infill, multi-lot takedowns, spec and custom builds. Bring the sales or hold plan; for a pre-sold home, include the executed contract and any related construction obligations.
A licensed GC, contractor license and insurance, an executed GC agreement and an itemized budget. Plans, permits and the construction schedule should describe the same scope so underwriting and the draw plan stay aligned.
A DSCR refinance is an exit for a completed rental property that meets the rental program requirements. Identify the hold plan early and provide the finished-property rent evidence and supported value. Construction approval does not guarantee the refinance.
The appraisal must support the as-complete value against the plans, specifications and relevant comparable sales. High-end finishes and larger budgets need a clear itemized scope and GC support; a larger budget alone does not establish value. Luxury builds use the same construction terms and 48-hour draws, not a separate assumed leverage tier.
The loan structure is interest-only for 12–24 months. The project schedule, plans, permit status, GC documents and valuation determine the path to closing and each draw. Bring a costed entitlement path if approvals are still pending; closing timing is file-specific.
Address, land basis, construction budget and intended exit.