DSCR FROM 5.75%BRIDGE FROM 8.25%TERM SHEETS IN 24HLENDING IN 42 STATES
SiltCapital
DSCR LoansHELOCAcademyRatesToolsAboutContactGet a Term Sheet
HOME / GROUND-UP / BY STATE / PENNSYLVANIA

Ground-up construction loans in Pennsylvania

Ground-up construction financing in Pennsylvania covers single-family and 2–4 unit builds, from the lot to the final line item, sized on cost and capped on as-complete value. Program terms do not change by state; permits, closing costs and the lien process do. Here is what applies in Pennsylvania.

PROGRAM TERMS · SAME IN EVERY STATE

Ground-up terms in Pennsylvania

Silt's terms do not change at the state line. The term sheet reflects the property, the file and the supported value.

Loan amounts
$200K – $10M
Residential scope
1–4 units · nationwide
Leverage
90% LTC · 70% ARV
Structure
Interest-only, 12–24 mo
Draws
Funded in 48h, app-based
Projects
Infill & multi-lot
WHAT IS SPECIFIC TO PENNSYLVANIA

Pennsylvania facts that touch this loan

  • Foreclosure. Pennsylvania is listed as a judicial-foreclosure jurisdiction: the lender files in court and a judgment precedes the sale. Court calendars, not the deed of trust, set the pace, so distressed-asset timelines in Pennsylvania run longer than in power-of-sale states. [1]
  • Transfer tax. Realty transfer tax is 1% to the Commonwealth on the value transferred, plus a local realty transfer tax set by the municipality and school district — higher in Philadelphia and Pittsburgh. Confirm the local component with the title company. [2]
  • Assessment. Counties may assess on a base year rather than reassessing on a cycle, and the State Tax Equalization Board certifies a common level ratio for each county every year — so the seller's current bill can be a poor guide to the tax line in your DSCR. [3]
  • LLC vesting. An LLC formed outside Pennsylvania must deliver a foreign registration statement to the Department of State before doing business there. [4]
GROUND-UP · GET MY NUMBER

Run your numbers

Land value is an input assumption, not confirmed equity. Interest assumes the loan is fully drawn; actual draws change interest.

Loading current rate…

LARGEST METRO AREAS

Where Pennsylvania's population is

By Census Bureau population estimates. Silt lends statewide — these markets are not a limit. Metro areas may cross state lines. [5]

  • Philadelphia
  • Pittsburgh
  • Allentown–Bethlehem
FAQ

Ground-up in Pennsylvania: questions investors ask

Does Silt make ground-up loans in Pennsylvania?

Yes. Pennsylvania is one of the states Silt lends in, and the ground-up program covers single-family and 2–4 unit residential construction — infill, multi-lot, spec, custom and luxury.

Is Pennsylvania a judicial or non-judicial foreclosure state?

Pennsylvania is listed as a judicial-foreclosure jurisdiction: the lender files in court and a judgment precedes the sale. Court calendars, not the deed of trust, set the pace, so distressed-asset timelines in Pennsylvania run longer than in power-of-sale states.

Do ground-up terms change in Pennsylvania?

No. The program terms are the same in every state Silt lends in: loan amounts $200K – $10M; residential scope 1–4 units · nationwide; leverage 90% LTC · 70% ARV; structure Interest-only, 12–24 mo; draws Funded in 48h, app-based; projects Infill & multi-lot. The final term sheet reflects the property and the file.

Can I close in an LLC in Pennsylvania?

Every Silt loan closes in an LLC or corporation, never a personal name. An LLC formed outside Pennsylvania must deliver a foreign registration statement to the Department of State before doing business there.

What closing taxes should I budget in Pennsylvania?

Realty transfer tax is 1% to the Commonwealth on the value transferred, plus a local realty transfer tax set by the municipality and school district — higher in Philadelphia and Pittsburgh. Confirm the local component with the title company.

What do you need from the general contractor?

A licensed GC, contractor license and insurance, an executed GC agreement and an itemized budget. Plans, permits and the construction schedule should describe the same scope so underwriting and the draw plan stay aligned.