Land
$120,000
Construction budget
$380,000
As-complete value
$660,000
Loan
$400,000
Loan-to-cost
80%
Rate
9.50%
Points
2
Term
24 months, interest-only
Days to close
12
Units
Single-family
Exit
Sale
Rendering — the finished build, Richmond, VA
Rendering — the finished build, Richmond, VA
THE STORY

Situation

A first-time builder owned a residential lot in a Richmond suburb and wanted to build a new single-family home for sale, with no completed projects of their own.

Structure

They hired a licensed GC with many completed homes in the county; the GC’s projects counted as the borrower’s experience. As a Tier 1 file the loan priced a step below the maximum — 80% of the $500,000 total cost at 9.50% with two points — and closed in 12 days.

In numbers: a $400,000 loan against $500,000 of total cost left $100,000 of borrower equity in the deal. The value test — 75% of the $660,000 as-complete value ($495,000) — sat above the loan, so cost, not value, set the size. Fully drawn, interest-only carry at 9.50% works out to about $3,167 a month, and 2 points of origination came to $8,000 at closing.

Draws

Foundation, framing, rough-in and final draws were requested by the GC with photos and invoices.

The file

What was in the file: the land documents, the plans and specifications, the itemised hard- and soft-cost budget and build schedule, the as-complete value estimate with comparable new-construction sales, the GC agreement with license and insurance, builder’s risk insurance, and bank statements showing the cash to close and six months of reserves. Because the borrower had no completed projects of their own, the GC’s license, insurance and list of completed projects carried the experience review. The appraisal valued the home as complete against recent new-construction sales nearby. Every checklist item came back inside 48 hours, which kept the close at the fast end of the range. Title was opened on the day of application and insurance was bound before the appraisal came back. The term sheet set the final leverage and pricing against the published maximums.

Exit

The home sold at completion; the borrower now has their own completed project for the next file.

Rendering — the lot before construction, Richmond, VA
Rendering — the lot before construction, Richmond, VA
WHAT MADE IT WORK
  • Qualified on the GC’s experience
  • Conservative first-project leverage
  • Itemised GC budget
  • Clear sale exit

Ground-up construction program terms →

Ground-up construction loans in Virginia →

GROUND-UP · GET MY NUMBER

Run your numbers

Up to 85% of total cost, capped at 75% of as-complete value, from 9.00% + 2 points. Land value is an input assumption, not confirmed equity. Interest assumes the loan is fully drawn; actual draws change interest.

Rates from 9.00% · published program rate.

Construction and renovation loans are funded through a lending partner; terms set at the term sheet.