$595K ground-up build in Las Vegas, NV — 85% LTC, 12-day close

Illustrative case study modelled on typical files for this program; figures are examples, not a funded loan.

Land
$180,000
Construction budget
$520,000
As-complete value
$940,000
Loan
$595,000
Loan-to-cost
85%
Rate
9.00%
Points
2
Term
24 months, interest-only
Days to close
12
Units
Single-family
Exit
Sale
Rendering — the finished build, Las Vegas, NV
Rendering — the finished build, Las Vegas, NV
THE STORY

Situation

A builder took down a finished lot in a Las Vegas suburb to build a single-family spec home in a market with steady new-home absorption.

Structure

The loan funded 85% of the $700,000 total cost at 9.00% with two points on a 24-month term, inside the 75% cap on the $940,000 as-complete value. It closed in 12 days.

In numbers: a $595,000 loan against $700,000 of total cost left $105,000 of borrower equity in the deal. The value test — 75% of the $940,000 as-complete value ($705,000) — sat above the loan, so cost, not value, set the size. Fully drawn, interest-only carry at 9.00% works out to about $4,463 a month, and 2 points of origination came to $11,900 at closing.

Draws

Foundation, framing, rough-in and final draws were released against photos and invoices.

The file

What was in the file: the land documents, the plans and specifications, the itemised hard- and soft-cost budget and build schedule, the as-complete value estimate with comparable new-construction sales, the GC agreement with license and insurance, builder’s risk insurance, and bank statements showing the cash to close and six months of reserves. The appraisal valued the home as complete against recent new-construction sales nearby. Every checklist item came back inside 48 hours, which kept the close at the fast end of the range. Title was opened on the day of application and insurance was bound before the appraisal came back. The term sheet set the final leverage and pricing against the published maximums.

Exit

The home sold at completion, repaying the loan with no prepayment penalty.

Rendering — the lot before construction, Las Vegas, NV
Rendering — the lot before construction, Las Vegas, NV
WHAT MADE IT WORK
  • Steady new-home absorption
  • Repeat builder experience
  • Phased draws matched the schedule
  • Clear spec-sale exit

Ground-up construction program terms →

Ground-up construction loans in Nevada →

GROUND-UP · GET MY NUMBER

Run your numbers

Up to 85% of total cost, capped at 75% of as-complete value, from 9.00% + 2 points. Land value is an input assumption, not confirmed equity. Interest assumes the loan is fully drawn; actual draws change interest.