$612K ground-up build in St. Louis, MO — 80% LTC, 13-day close

Illustrative case study modelled on typical files for this program; figures are examples, not a funded loan.

Land
$191,000
Construction budget
$574,000
As-complete value
$1,186,000
Loan
$612,000
Loan-to-cost
80%
Rate
9.25%
Points
2
Experience tier
Tier 2 · Builder
Term
24 months, interest-only
Days to close
13
Units
Single-family
Exit
Sale
Rendering — the finished build, St. Louis, MO
Rendering — the finished build, St. Louis, MO
THE STORY

Situation

This illustrative St. Louis, MO scenario models a single-family pre-sold build with four completed projects. The plan covers a documented single-family plan, foundation, framing, mechanicals and finishes. The budget separates each phase before closing; city-level location is illustrative and identifies no real property or borrower.

Structure

Tier 2 sizes the example at 80% of total cost, subject to the tier’s purchase-and-rehab or construction-cost limit and value cap. The selected tier sets interest-only pricing and points. A complete contract, scope, entity file and GC record model a 13-day close; final terms remain subject to underwriting.

In numbers: a $612,000 loan against $765,000 of total cost left $153,000 of borrower equity in the deal. The value test — 75% of the $1,186,000 as-complete value ($889,500) — sat above the loan, so cost, not value, set the size. Fully drawn, interest-only carry at 9.25% works out to about $4,718 a month, and 2 points of origination came to $12,240 at closing.

Draws

Foundation, framing, rough-in and final phases each have an allocated budget. Photos, invoices and an inspection appropriate to the completed milestone support each request; undisbursed funds remain tied to the approved scope.

The file

What was in the file: the land documents, the plans and specifications, the itemised hard- and soft-cost budget and build schedule, the as-complete value estimate with comparable new-construction sales, the GC agreement with license and insurance, builder’s risk insurance, and bank statements showing the cash to close and six months of reserves. The appraisal valued the home as complete against recent new-construction sales nearby. Every checklist item came back inside 48 hours, which kept the close at the fast end of the range. Title was opened on the day of application and insurance was bound before the appraisal came back. The term sheet set the final leverage and pricing against the published maximums.

Exit

The model ends with completion and a sale that repays the short-term loan. The investor tracks carrying costs through the sale period rather than treating an asking price as a guaranteed outcome. There is no prepayment penalty under the program terms.

Rendering — the lot before construction, St. Louis, MO
Rendering — the lot before construction, St. Louis, MO
WHAT MADE IT WORK
  • Named tier matches leverage and pricing
  • Single-family scope and itemised budget
  • GC record reviewed with the file
  • Exit evaluated independently

Ground-up construction program terms →

Ground-up construction loans in Missouri →

TIMELINE · ILLUSTRATIVE WEEKS FROM APPLICATION
  1. Week 1.9Close
  2. Week 6Draw 1
  3. Week 12Draw 2
  4. Week 20Draw 3
  5. Week 30Draw 4
  6. Week 40Sale
Rendering — framing during construction, St. Louis, MO
Rendering — framing during construction, St. Louis, MO
GROUND-UP · GET MY NUMBER

Run your numbers

Up to 85% of total cost, capped at 75% of as-complete value, from 9.00% + 2 points. Land value is an input assumption, not confirmed equity. Interest assumes the loan is fully drawn; actual draws change interest.

9.00% from · as of Oct 28, 2026

Construction and renovation loans are funded through a lending partner; terms set at the term sheet.